How to Draw a Site Plan for a Home Addition Permit (Free)

An addition is reviewed as part of the house. The site plan has to show the building that is already there, the piece you are adding, and the distance from the new work to every property line it approaches. Floor plans and elevations are other sheets. This is the plot plan.

Free · runs in your browser · your files never leave your device

Use the house setbacks, not the shed setbacks

Sheds and detached garages are accessory structures and often get a shorter side or rear setback. A room addition, a bump-out, or a second story over an existing wing is principal structure. It has to meet the setbacks for the dwelling.

Those distances are zoning, so they are not the same from town to town. A pattern you will see often in single-family districts is a deeper front and rear yard than the side yards, with a larger setback on a corner lot's street side. Write down the required front, interior side, street side, and rear yards from your district standards, plus the maximum lot coverage and height. Do not copy a neighboring city's table.

Some cities also require a licensed architect or engineer to seal the construction drawings for an addition, even when they will accept a clear plot plan from the owner. Ask before you assume the site plan is the whole submittal.

What reviewers look for on the plot plan

Residential addition checklists from building departments line up on this list:

ElementWhy it matters
Property lines, lot dimensions, and lot areaCoverage is a percentage of this number
Street name and adjacent right-of-wayShows which yard is the front
Existing house, labeled, with distances to the lot linesContext, and proof the house itself is legally placed
Proposed addition, labeled, with length, width, and heightThe work being approved
Distances from the addition to each lot line and to other buildingsThe setback check
EasementsAn addition over a utility easement is a reject even inside the setback
What is being removedA demolished porch or a wall that moves changes the footprint
Driveway and any new impervious areaSome codes cap impervious cover separately from building cover
North arrow, scale, addressSo the sheet can be checked without a site visit

If the addition is large, the same application may also want grading, erosion control, or a drainage note. That is a separate plan. The site plan still needs to show the footprint those sheets refer to.

Existing and proposed have to be obvious

The most common plotting mistake is one outline that mixes the old house and the new room. Reviewers want two graphics:

If you are removing a deck or a wall to build the addition, label that area “to be removed” instead of leaving it looking like new work. A second story over an existing footprint should say so. Otherwise the coverage math double-counts the ground floor.

Lot coverage

Add the existing roofed footprint and the new footprint, then divide by the lot area. Open decks, eaves, and detached sheds may or may not be in that total — the zoning definition decides. Impervious cover is often a second percentage and includes driveway, walks, and patios.

In ZoneMapper, shapes you draw start as impervious and count toward coverage. Set Surface in Layers when a patio or gravel area should be permeable, gravel, or not counted. Enter the district's maximum in the compliance fields so the pass/fail is on the sheet you export, not only in your notes.

How to draw it free in ZoneMapper (about an hour)

1. Open the addition template, a survey, or your address

Start from template and choose Addition for a sample house with a side addition, dimensions, and placeholder setbacks. Replace every sample number. A survey PDF is the better base when you have one. Address lookup loads aerial imagery and, where coverage exists, a GIS parcel outline you should still check against the survey.

2. Trace the lot

Use Lot boundary and Finish lot boundary if the outline is not already on the map. The lot area used for coverage comes from that boundary.

3. Draw the house, then the addition

Draw the existing house and mark it Existing. Draw the addition with Rectangle at its real width and depth and leave it Proposed. Label both.

4. Dimension the yards

Use Dimension from the addition to each lot line it approaches, and from the existing house where the checklist asks for those too. Enter the required setbacks in the Setbacks panel. If the red zone covers the addition, the plan fails the rule you typed in — move the addition or confirm you are in variance territory before you apply.

5. Export the plot plan

Fill in the title block and export the PDF. Submit it with the floor plan, elevations, and any sealed sheets your department requires.

Close to the line: some building-department checklists ask for an as-built survey when new work is within 12 inches of a required setback. If your dimension is that tight, expect the condition before you pour.

Common reasons addition site plans are rejected

FAQ

Is a site plan enough for a small bump-out?

Rarely for the building permit. Even a one-room addition usually needs a floor plan and a section so they can see headers, egress, and the foundation. The site plan is the zoning sheet in that set. Some places waive full design review for a minor addition that matches the house and stays inside the setbacks, but they still want the plot plan.

What if the existing house is already in the setback?

You generally cannot extend the nonconforming wall further into the setback. You can often build up or back within the legal envelope. That is a zoning question to confirm in writing, and it is a common reason to apply for a variance instead of a straight permit. Show both the existing encroachment and the proposed wall so the reviewer can see you did not make it worse.

Do second-story additions need a new site plan?

Yes. Even when the footprint does not grow, the plan should say the work is a second story, show the height, and confirm the footprint underneath. Height limits and sometimes floor-area ratios still apply.

More permit guides

ZoneMapper is a drafting aid. Setbacks, height, coverage, and whether construction drawings must be sealed vary by jurisdiction. Verify them with your building department before you submit or build.

Ready to draw your addition site plan?

Free, private, and no account needed. Start from the addition template, your address, or a survey.